View gallery Floorplan Local area EPC Brochure
Love

4 Dene Close

Woburn Sands, Bedfordshire, MK17 8NL

Guide Price
£995,000
5
4
3

Property Highlights

  • Contemporary split level detached house
  • Five bedrooms; four bath/shower rooms
  • Sitting room opening to a wraparound deck
  • Open plan kitchen/breakfast/dining room; utility room,
  • Mezzanine study with Juliet balcony
  • Air con to sitting room and principal and guest bedrooms
  • West facing deck and patios with shingle and paving
  • Single garage and off street parking

Property description

A contemporary split level five bedroom detached house including a self-contained one bedroom annexe - if required - off street parking, a garage, and a westerly facing garden, 5 minutes’ walk from Woburn Sands High Street.

The property has 2,686 sq. ft. of accommodation over two main floors. Included on the ground floor are an entrance hall, a dual aspect sitting room , a kitchen/breakfast/dining room with a utility room and a cloakroom, two bedrooms, and a shower room. The one bedroom annexe (council tax banding A) has a sitting room, and a bedroom with an en suite shower room and a kitchenette. It has its own entrance or can be accessed via the entrance hall. On the first floor, the dual aspect principal bedroom, measuring over 22 ft. by over 18 ft., has a vaulted ceiling and a wide window overlooking the rear with far reaching views. A door leads to a dressing area which gives access to a four piece en suite bathroom. There is a guest bedroom (bedroom two) which also has an en suite shower room. Separate stairs lead to a mezzanine study above the sitting room, with Velux windows and a Juliet balcony. There is a west facing decked terrace, a shingle and paved garden, and a single garage.

Reception Rooms and Kitchen

Stairs from the dining area lead to a sitting room with a tiled floor with underfloor heating, and sliding doors to a wraparound deck. A second flight of stairs leads to a mezzanine, used as a study and with fitted furniture. The kitchen has gloss wall, base, and larder units, including soft close drawers and a display unit. There is a stainless steel sink with a mixer tap and waste disposal, granite worktops, and a breakfast bar and dining table. Neff integrated appliances include a fridge, a microwave, a warming drawer, a double oven, an induction hob with an extractor, and a dishwasher; there is a built-in freezer.

Outside

At the front of the property, a gravel driveway provides parking ahead of a brick retaining wall enclosing a paved courtyard which has plants and flowers and gives access to the annexe and the front door of the main house. To the rear of the house is a wraparound deck with a frosted glass balustrade. Steps from the deck lead down to a shingle and paved garden with a variety of plants, shrubs and trees. From the paved area, steps lead up to an additional raised paved patio.

Situation and Schooling

The Buckinghamshire village of Woburn Sands has a traditonal high street with shops, restaurants, and public houses. There are GP and dental surgeries and a monthly farmers' market held on the village green. Swallowfield Primary School and Fulbrook Extended Secondary School, are in Woburn Sands. The village also has a daily bus service to the Harpur Trust Schools in Bedford, and Thornton, and Akeley Wood schools.

+ Read more

Contact us

Michael Graham Woburn Sands
01908 586400
salesws@michaelgraham.co.uk


Request a viewing

Interested in viewing this property? You can easily request your viewing online or give us a call on 01908 586400.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…