View gallery Floorplan Local area EPC
Love

12 Downs View

Bow Brickhill, Buckinghamshire, MK17 9JS

Guide Price
£725,000
5
3
3

Property Highlights

  • Modern detached house
  • Five bedrooms
  • Three bath/shower rooms
  • Three reception areas
  • Kitchen/Breakfast room
  • Garage and driveway parking
  • Mature garden with far reaching views
  • Village location

Property description

A modern five bedroom detached house with a garage, off street parking and a mature garden with far reaching views in a quiet cul-de-sac location.

This property has 2,034 sq. ft. of accommodation arranged over two floors, including on the ground floor, an entrance hall with the staircase, a storage cupboard, and the downstairs cloakroom. A door opens to the study. A walk through leads to the sitting room which accesses a dining/family room, which is open plan to a 34 ft. kitchen/breakfast room with an adjacent utility room. On the first floor, both the principal and second bedrooms have access to the roof space and three piece ensuite shower rooms. There are three further bedrooms and a family bathroom. The front garden is block paved, providing parking for several cars. There are mature shrubs planted in the borders and paths at both sides of the house access the rear. There is a Pod-Point electric car charging point. The single garage has power and light.

Kitchen/Breakfast & Utility

The kitchen/breakfast room is fully fitted with a range of wall and base units, granite work surfaces, and a ceramic sink. There is an integrated Rangemaster oven with an extractor over. A window above the sink overlooks the rear garden and French doors open to the patio and garden. Accessed from the kitchen, the utility room has wall and base units and a stainless steel sink. There is plumbing for a washing machine and a dishwasher. Doors lead to the side and to the integrated garage

Outside

Overlooking Duke of Bedford woodland, the rear garden is approximately 92 ft. long by 41 ft. wide and is secluded and private. It is mainly laid to lawn with established beds and borders, well-stocked with a variety of shrubs and bushes. There is a variety of mature trees and a paved terrace at the far end of the garden with a pergola. Immediately adjacent to the rear of the property is a block paved patio.

Situation and Schooling

Bow Brickhill is a small village with a 'gastro pub' - The Wheatsheaf - and Bow Brickhill C of E primary school. The town of Woburn Sands is approximately 2 miles away and has a high street with shops, restaurants, public houses., and doctorsu2019 and dentists' surgeries. Further schooling can be found at Swallowfield primary school and Fulbrook extended secondary school. The market town of Woburn is approximately 4 miles away and Bow Brickhill woods and Caldecotte lake are nearby.

+ Read more

Contact us

Michael Graham Woburn Sands
01908 586400
salesws@michaelgraham.co.uk


Speak to us

If you would like to get in touch with us or have any questions regarding this property, please click the button below.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…