View gallery Floorplan Local area EPC Brochure
Love

6 Chapel Street

Woburn Sands, Buckinghamshire, MK17 8PG

Guide Price
£415,000
2
1
2

Property Highlights

  • 19th-century end of terrace house
  • Updated but retaining character features
  • Two bedrooms
  • Family bathroom
  • Two separate reception rooms
  • Fitted kitchen, conservatory
  • Established rear garden
  • Walking distance to Woburn Sands High Street

Property description

A Victorian brick under tile two bedroom end of terrace house less with an enclosed rear garden than 10 yards from Woburn Sands High Street.

This property has 975 sq. ft. of accommodation over two floors. A solid front door opens into the nearly 12 ft. square sitting room. This has a window to the front and a brick chimney breast with an open fireplace, a slate hearth and a multi fuel burner. The over 14 ft by nearly 12 ft. dining room has French doors to the garden, and leads into the kitchen, which has a door to the conservatory. A wooden floor runs throughout the sitting room, dining room and kitchen. A staircase with turned balusters and a newel post from the dining room leads up to the first floor L-shaped landing with storage. Leading off are a principal bedroom with a brick chimney breast and an original cast iron fireplace, a second bedroom with two windows and storage, and a family bathroom. To the front of the property, is a garden with a brick wall boundary and a path to the front door. The established rear garden has a patio, a lawn, mature plants and shrubbery, and a pond. There are two garden sheds.

Kitchen and Conservatory

At the rear of the house, the nearly 16 ft. long kitchen is fitted with a range of Shaker style wall and base units with wooden worktops and a butler’s style ceramic sink beneath a side window. Included are a glazed display unit, a wine rack, and a pull-out unit, as well as a double built-under oven with an electric hob and an extractor over. There is ample room for a full-height fridge and further appliances. A partially glazed door opens into the over 11 ft. long conservatory which has sliding glazed doors opening to the patio and garden.

Situation and Schooling

The Buckinghamshire village of Woburn Sands has a high street with GP and dental surgeries, shops, restaurants, and public houses. There is a monthly farmers' market held on the village green. There are two schools in Woburn Sands - Swallowfield Primary and Fulbrook Extended Secondary, both with Good Ofsted reports - and a daily bus service to Bedford, Thornton, and Akeley Wood schools.

+ Read more

Contact us

Michael Graham Woburn Sands
01908 586400
salesws@michaelgraham.co.uk


Request a viewing

Interested in viewing this property? You can easily request your viewing online or give us a call on 01908 586400.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…