View gallery Floorplan Local area EPC Brochure
Love

74A Station Road

Bow Brickhill, Buckinghamshire, MK17 9JT

Asking Price
£1,600,000
4
3
3

Property Highlights

  • Modern detached house
  • Four bedrooms; three bath/shower rooms
  • Three reception rooms
  • Kitchen/breakfast room, utility and boot room
  • Conservatory with air conditioning
  • 3 acres of formal gardens, orchards, fields and paddocks
  • Workshop, summerhouse, greenhouses, barn and field shelter
  • Far reaching countryside views

Property description

A modern four bedroom detached house set in 3 acres of grounds including formal gardens with outhouses and adjoining fields and paddocks with far reaching countryside views.

This brick under tile property has over 3,300 sq. ft. of versatile accommodation set over two floors. On the ground floor there is an entrance hall with stairs to the first floor with an understairs cupboard, and a cloakroom. Doors open to a sitting room, a dining room which leads into a study, and a utility room with a walk through to a boot room and access to the kitchen/breakfast room. Sliding doors in the study and dining room access a conservatory with air conditioning. The hallway, sitting room and downstairs cloakroom all have underfloor heating. On the first floor, the principal bedroom has a Juliet balcony, a dressing room, an en suite shower room, and underfloor heating. Bedroom two also has an en suite shower room. There are two further bedrooms and a family bathroom. The property is approached via remotely controlled electric gates which open to the driveway. A CCTV system and an intruder alarm system operate throughout the property and across the grounds.

Ground Floor

The nearly 20 ft. square dual aspect sitting room has views over the formal gardens with double French doors to the terrace and a contemporary open fire. Accessed via the boot room, which has a door to the front drive, or the study, the newly refurbished kitchen/breakfast room measures over 18 ft. long and has French doors to the rear. The kitchen is fitted with a range of bespoke gloss fronted wall and base units with complementary worksurfaces, mirrored splashbacks, a breakfast bar, and an inset sink. A range style cooker, a wine chiller, and a Neff dishwasher will remain.

First Floor

Leading off the first floor landing, which has built-in storage with sliding doors, the principal bedroom has a walk-in dressing room with fitted wardrobes, an en suite bathroom with twin wash basins, a double shower, a WC, and underfloor heating. The Juliet balcony overlooks the south facing gardens and grounds. There are three further bedrooms, all with fitted wardrobes and one with an en suite shower room, and a dual aspect family bathroom.

Outside

The formal gardens are laid to lawn with a paved terrace, seating areas, and a hot tub, all designed for relaxation and entertaining. There is a pond with a wooden bridge, surrounded by established shrubs, and there is a variety of mature trees and clipped hedges. Also included are a vegetable garden, a gardener’s cloakroom, and various outbuildings. Fields and paddocks with security beams adjoin the gardens.

Situation and Schooling

Bow Brickhill is a small village with a 'gastro pub', The Wheatsheaf, and Bow Brickhill C of E primary school. The town of Woburn Sands is approximately 2 miles away and has a high street with shops, restaurants, and public houses. There are doctors’ and dentists' surgeries. Further schooling can be found at Swallowfield Primary School and Fulbrook Extended Secondary School.

+ Read more

Contact us

Michael Graham Woburn Sands
01908 586400
salesws@michaelgraham.co.uk


Request a viewing

Interested in viewing this property? You can easily request your viewing online or give us a call on 01908 586400.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…