View gallery Floorplan Local area EPC Brochure
Love

6 Felsted

Caldecotte, Buckinghamshire, MK7 8FE

£790,000
4
3
3

Property Highlights

  • Four storey town house
  • Four double bedrooms
  • Three bath or shower rooms, two of which are en suite
  • Three separate reception rooms
  • Kitchen/breakfast room, cloakroom
  • Two terraces and a balcony with views
  • Overlooking Caldecotte Lake
  • Underground parking for two cars

Property description

A modern four bedroom terraced town house with three reception rooms, private residents’ parking, with terraces and a balcony overlooking nearby Caldecotte Lake.

The property has in excess of 2,100 sq. ft of accommodation arranged over four floors. On the ground floor there is an entrance hall with stairs to the first floor landing, an understairs cupboard, and a cloakroom. Doors access a dining room and a kitchen/breakfast room with French doors to the rear terrace. On the first floor the landing has a built-in cupboard. There are two reception rooms, a sitting room with two sets of French doors to a balcony overlooking the lake, and a family room with a window and a Juliet balcony overlooking the front. Leading off the second floor landing are a bathroom and three double bedrooms, all with built-in storage and one, measuring over 16 ft. by over 14 ft., with an en suite shower room and double windows overlooking the lake. The principal bedroom suite occupies the entire third floor. Outside and to the front, there is access to the communal parking. To the rear (roadside) there is a terrace with ample space for relaxing and al fresco dining.

Kitchen/Breakfast Room

The kitchen/breakfast room measures over 16 ft. by over 14 ft. and has a range of contemporary matt fronted base and wall units, with contrasting work surfaces with an inset stainless steel one-and-a-half sink and drainer, and tiled splashbacks. Integrated appliances include an induction hob with an extractor over, twin electric ovens, a dishwasher, and a fridge/freezer. There is also a washing machine. There are ceiling spotlights, a tiled floor which continues into the breakfast area, where there is ample room for a table, and a set of French doors with flanking windows to a railed balcony overlooking the lake.

Principal Bedroom

Located on the third floor with a vaulted ceiling, and measuring over 18 ft. by over 16 ft., the principal bedroom has a step up to sliding double doors leading out to a railed balcony with space for seating overlooking the lake. There is a walk through to a dressing area with further built-in wardrobes and a Velux window above. The fully tiled en suite has a walk-in shower, a WC, and a washbasin.

Situation and Schooling

The property is situated 5 miles from Milton Keynes Coachway. Bow Brickhill railway station (0.25 miles) has services to Bedford. Shopping facilities are at the MK1 Shopping Park (1.5 miles), with further shopping in Central Milton Keynes (5 miles). The property is in the Walton High and Heronsgate Primary schools' catchment areas.

Agents Note

Purchaser Compliance & Administration Fee To comply with the Money Laundering, Terrorist Financing and Transfer of Funds (Information on the Payer) Regulations 2017, Michael Graham is legally mandated to conduct compulsory Anti-Money Laundering (AML) and Customer Due Diligence (CDD) checks on all property buyers. While we do not charge a commission fee to the property vendor, a mandatory compliance and administration fee of £54.00 (inclusive of VAT) per person is payable by the purchaser(s). This non-refundable fee covers the cost of third-party electronic identity verification, source of funds auditing, and the associated regulatory administration. This fee becomes payable upon an offer being accepted in principle and must be fully cleared before a Memorandum of Sale can be issued or solicitors instructed. The payment of this fee does not guarantee the completion of the transaction, and Michael Graham reserves the right to request further verification documentation to satisfy its statutory obligations.

+ Read more

Contact us

Michael Graham Milton Keynes
01908 399199
salesmk@michaelgraham.co.uk


Request a viewing

Interested in viewing this property? You can easily request your viewing online or give us a call on 01908 399199.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…