View gallery Floorplan Local area EPC Brochure
Love

19 Ravel Close

Old Farm Park, Buckinghamshire, MK7 8EY

£700,000
5
2
3

Property Highlights

  • Detached property
  • Five bedrooms
  • Bathroom, en suite bathroom, cloakroom
  • Sitting room, dining room and study
  • Kitchen/breakfast room and utility room
  • Enclosed south easterly facing rear garden
  • Double garage, parking for four cars
  • Walton High school catchment

Property description

A five bedroom detached property with three reception rooms, a partly walled rear garden, driveway parking and a double garage, located in Old Farm Park.

The property has over 1,850 sq. ft. of accommodation over two floors. The ground floor has an entrance hall with a built-in cupboard, a cloakroom and stairs to the first floor. The kitchen has a window overlooking the garden and the utility room has a door to the side. There are three separate reception rooms including a nearly 20 ft. dual aspect sitting room with a feature fireplace, a study and a dining room. Both the sitting and dining rooms have French doors to a paved terrace in the rear garden. The first floor landing has a built-in cupboard and access to a loft. The principal bedroom has a dressing room and en suite bathroom. Four further bedrooms share a four piece family bathroom. Driveway parking for up to four cars at the front leads to the attached double garage which has an up and over door, light and power, and a door to the garden. The front has a small lawn with hedge boundaries and the rear garden is mainly lawned with mature shrubs and trees for screening.

Kitchen/Breakfast Room

The kitchen/breakfast room has a stone tiled floor and a range of farmhouse style wall and base cupboards, with tiled splashbacks and laminate work surfaces incorporating a ceramic sink and drainer. A recess has space for a range cooker with a hidden extractor over, and there is also space for a dishwasher and a breakfast table and chairs. A window overlooks the garden and there is a walk through to a utility room which has a base unit with a sink and drainer, and a door to the garden.

Principal Suite

The principal bedroom has a window to the front and a walkthrough to the dressing room which has a door to the en suite which has half tiled walls, laminate flooring, a panel bath, an enclosed shower cubicle, a wash basin, WC and a window to the front. Both the bedroom and dressing room currently have free standing furniture but could accommodate fitted units if desired.

Situation and Schooling

Nearby leisure facilities include Caldecotte Lake (1 mile) and Woburn Golf Centre (5 miles). For shopping the Kingston Centre is 2 miles and Central Milton Keynes is 6 miles. Milton Keynes Central railway station is also 6 miles away and M1 junction 13 is 4 miles. The property is within the Walton High School catchment area. There are further shopping facilities and GP, dental and veterinary surgeries in Walnut Tree (1 mile).

Agents Note

Purchaser Compliance & Administration Fee To comply with the Money Laundering, Terrorist Financing and Transfer of Funds (Information on the Payer) Regulations 2017, Michael Graham is legally mandated to conduct compulsory Anti-Money Laundering (AML) and Customer Due Diligence (CDD) checks on all property buyers. While we do not charge a commission fee to the property vendor, a mandatory compliance and administration fee of £54.00 (inclusive of VAT) per person is payable by the purchaser(s). This non-refundable fee covers the cost of third-party electronic identity verification, source of funds auditing, and the associated regulatory administration. This fee becomes payable upon an offer being accepted in principle and must be fully cleared before a Memorandum of Sale can be issued or solicitors instructed. The payment of this fee does not guarantee the completion of the transaction, and Michael Graham reserves the right to request further verification documentation to satisfy its statutory obligations.

+ Read more

Contact us

Michael Graham Milton Keynes
01908 399199
salesmk@michaelgraham.co.uk


Request a viewing

Interested in viewing this property? You can easily request your viewing online or give us a call on 01908 399199.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…