View gallery Floorplan Local area EPC Brochure
Love

8 Brookfields

Stoke Hammond, Buckinghamshire, MK17 9FR

Offers Over
£695,000
4
3
2

Property Highlights

  • Modern detached property
  • Four double bedrooms
  • Three bath or shower rooms
  • Open plan kitchen/dining/family room
  • Two further reception rooms
  • Double garage, parking for four cars
  • Enclosed garden
  • Village location

Property description

A modern four bedroom detached property with driveway parking, a double garage, and an enclosed easterly facing rear garden, in a cul-de-sac of similar properties in the Buckinghamshire village of Stoke Hammond.

Built in 2019, the property has approximately 1,693 sq. ft. of accommodation over two floors. On the ground floor there is an entrance hall with stairs to the first floor, a built-in under stair cupboard and access to a cloakroom. The study has a window to the front and the sitting room has French doors to the garden and there is also a dining room which is open plan to the kitchen and family room. The kitchen has access to a utility room, which leads into the garage. On the first floor, the landing has access to an airing cupboard and the loft space. There are four double bedrooms; the principal bedroom and bedroom two each have an en suite shower room and there is also a family bathroom. At the front, there is a block paved driveway with parking for four cars in addition to the double garage which has power and light connected and a pedestrian door to the garden which can also be accessed via a gate at the side of the property.

Kitchen/Dining/Family Room

The kitchen/dining/family room is open plan with a tiled floor and double doors to the garden. The family area has a skylight window. The dining area has an open ended fireplace into the sitting room. The kitchen has a range of white fronted wall and base units, and a central island, with granite work surfaces and upstands and a stainless steel sink. Integrated appliances include an induction hob with an extractor over, twin electric ovens, a dishwasher and fridge/freezer. The utility room has a floor standing unit with a sink, and space under the work surface for a washing machine and dishwasher.

Garden

The rear garden has a paved patio which spans the entire width of the property, and wraps round to both sides providing ample space for tables and chairs for entertaining. The patio leads to a lawn with flower and shrub beds and borders, and the garden has fenced boundaries, a door into the garage and a gated side access.

Situation and Schooling

Nearby leisure facilities include the Three Locks Golf and Country Club (approximately 2 miles). Shopping facilities are available in Leighton Buzzard (approximately 3 miles) and Central Milton Keynes (approximately 9 miles). The property is situated within the Aylesbury grammar schools catchment area and there are GP surgeries and dental practitioners in Leighton Buzzard.

+ Read more

Contact us

Michael Graham Milton Keynes
01908 399199
salesmk@michaelgraham.co.uk


Request a viewing

Interested in viewing this property? You can easily request your viewing online or give us a call on 01908 399199.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…