View gallery Floorplan Local area EPC Brochure
Love

42A

Station Road, Bow Brickhill, Buckinghamshire, MK17 9JW

Guide Price
£450,000
3
2
2

Property Highlights

  • Modern house
  • Three bedrooms and first floor study
  • Two bathrooms, one en suite
  • Two separate reception rooms
  • Fitted kitchen, cloakroom
  • Established front and rear gardens
  • Driveway and garage
  • Village location

Property description

A 1970s three bedroom detached house with landscaped front and rear gardens, driveway, and a garage in a village location.

This modern property has approximately 1,510 sq. ft. of accommodation including on the ground floor: an L-shaped entrance hall with cupboards and stairs to the first floor landing, a sitting/dining room with French doors to the rear patio, a study overlooking the garden, a fitted kitchen, and a cloakroom. On the first floor, the principal bedroom has a dressing area and an en suite shower room. There are two further bedrooms and a study leading off the landing and a family bathroom. At the front of the property is an established garden with a retaining wall, and a lawn area with shrubs and trees. The rear garden is laid mainly to lawn with various paved seating areas, planting, and landscaping. The detached garage is positioned at the rear of the house.

Accommodation

Running the full depth of the house, the sitting/dining room measures over 27 ft. by over 13 ft. The sitting area has a picture window overlooking the front garden and a fireplace with a stone-coloured surround and hearth and an inset electric fire; the dining area has French doors with flanking windows to the rear patio and garden. The kitchen is fitted with a range of modern, matt wall and base units with beech worktops and a stainless steel sink. There is a built under single oven and a halogen hob with an extractor above.

Situation and Schooling

Bow Brickhill is a small village with a 'gastro pub', The Wheatsheaf, and Bow Brickhill C of E primary school. The town of Woburn Sands is approximately 2 miles away and has a high street with shops, restaurants, and public houses. There are doctors’ and dentists' surgeries. Further schooling can be found at Swallowfield primary school and Fulbrook extended secondary school.

+ Read more

Contact us

Michael Graham Woburn Sands
01908 586400
salesws@michaelgraham.co.uk


Request a viewing

Interested in viewing this property? You can easily request your viewing online or give us a call on 01908 586400.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…