View gallery Floorplan Local area EPC Brochure
Love

Hilltop Cottage

54 Mount Pleasant, Aspley Guise, Bedfordshire, MK17 8JU

Offers Over
£450,000
2
1
1

Property Highlights

  • Victorian cottage
  • Two bedrooms
  • Family bathroom
  • Sitting room
  • Kitchen/dining room
  • Utility room and cloakroom
  • Parking
  • Mature rear garden with far reaching views

Property description

A Victorian two bedroom mid terrace house with off street parking, a south westerly facing rear garden and far reaching countryside views.

This brick under slate property has 876 sq. ft. of accommodation over two floors. The ground floor has a stone floor with underfloor heating throughout and comprises a split level sitting room with a fireplace housing a log burning stove, a kitchen/dining room with a vaulted ceiling and French doors to the rear garden, a utility room, and a cloakroom. On the first floor the principal bedroom has a range of built in wardrobes and a window to the front. The other bedroom has a window to the rear with countryside views and there is a three piece family bathroom with a shower over the bath. At the front of the property is a paved parking bay. In accordance with the Estate Agents Act 1979, we disclose that the seller of this property is a member of staff at Michael Graham

Accommodation

The sitting room has a feature inglenook style brick fireplace with a timber bressummer and an inset log burning stove. There are stairs to the first floor with an under stairs store cupboard. The kitchen is fitted with a range of handmade Shaker style wall and base units, including a glazed display unit, and built-in bench seating. Complementary work surfaces incorporate a Belfast sink. Integrated appliances include a Miele dishwasher and a Fisher and Paykel fridge/freezer, and there is a Lacanche oven.

Outside

The rear garden is enclosed on all sides by fencing and has a paved entertaining area spanning the rear of the house. Steps led down to the lawn which is bordered on both sides by established flower and shrub beds. There is a further patio at the bottom of the garden, a garden shed and far reaching views over open countryside.

Situation and Schooling

Aspley Guise is 1.5 miles from the town of Woburn Sands which has a selection of shops and restaurants. Aspley Guise has The Anchor public house and The Blue Orchid Thai Restaurant. There is a lower school in Aspley Guise, and a primary and an extended secondary school in Woburn Sands. A daily shuttle bus runs to the Harpur Trust Schools in Bedford.

+ Read more

Contact us

Michael Graham Woburn Sands
01908 586400
salesws@michaelgraham.co.uk


Speak to us

If you would like to get in touch with us or have any questions regarding this property, please click the button below.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…