Central Milton Keynes, MK9 3NS
A newly refurbished two/three bedroom top floor apartment, with a single garage and an off street parking space, in Central Milton Keynes.
The 1,509 sq. ft. of accommodation includes an entrance hallway, an open plan kitchen/breakfast/sitting room with a utility room and an enclosed terrace. There are two double bedrooms both with built-in wardrobes, one with an en suite shower room, an office/nursery, and a family bathroom. Outside, there is a single garage and off street parking for one car. Additional parking permits can be obtained. There is a communal bin store on the ground floor of the apartment building. The property is available immediately, offered on an unfurnished basis.
The kitchen/breakfast/sitting room has integrated appliances including two ovens, a fridge, a freezer, a dishwasher and there is an electric fireplace. A patio door leads to the dual aspect enclosed terrace. The utility room has a washing machine and a tumble dryer.
The property is located towards the north end of the city centre, with the Centre MK and the Theatre District across Silbury Boulevard and is less than 0.25 mile from Campbell Park. Central Milton Keynes station is 1 mile away with trains to Euston taking 32 minutes and M1 Junction 14 is approximately 3.5 miles away
| Michael Graham Milton Keynes | |
| 01908 399199 | |
| lettingsmk@michaelgraham.co.uk |
If you would like to get in touch with us or have any questions regarding this property, please click the button below.
We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.
