View gallery Floorplan Local area EPC Brochure
Love

1 Old School Lane

Stoke Hammond, Buckinghamshire, MK17 9BW

Asking Price
£485,000
2
2
2

Property Highlights

  • Semi-detached Victorian property
  • Two bedrooms, first floor bathroom
  • Two reception rooms
  • Kitchen
  • Ground floor shower room
  • Enclosed, private garden
  • Garage, parking for two cars
  • Village location

Property description

A Victorian two bedroom semi-detached cottage with an enclosed rear garden, a tandem garage and off street parking located in the village of Stoke Hammond.

Dating back to 1880, the property has accommodation of approximately 936 sq. ft. set over two floors. On the ground floor, access to the property is through a gothic shaped front door directly into a galley style kitchen with a glazed door leading to the garden and a further door accessing a dual aspect sitting/dining room with a double-sided fireplace, stairs to the first floor, and a folding door into a snug/guest room. The ground floor shower room is reached via the snug. On the first floor, there are two double bedrooms - each with built-in cupboards - and a triple aspect three piece bathroom with a freestanding bath and a porthole window. The tandem garage is located further along Old School Lane from the property, which has a gated entrance and path to the front door. The front garden is mainly laid to lawn with flower and shrub beds and borders.

Sitting/Dining Room

The 24 ft. long triple aspect sitting/dining room has a feature double sided brick fireplace with a log burner in the centre of the rooms and a built-in cupboard on the dining room side. French doors lead out to the garden on the sitting room side, whilst stairs to the first floor and a door into a snug are on the dining room side. Oak flooring extends the length of both rooms. A folding door in the sitting/dining room leads to the snug/guest room which has an exposed brick arch leading to a walk-in bay with apsidal conservatory windows.

Outside

Accessed from the sitting room and the kitchen, the garden wraps around the side and rear of the property. From the sitting room double doors there is a block paved seating area screened by mature shrubs for privacy. Steps lead down to a further blocked paved patio area with a wooden pergola and space for patio furniture with mature shrubs and trees and fenced boundaries preventing being overlooked.

Situation and Schooling

Nearby leisure facilities include the Three Locks Golf and Country Club (about 2 miles). The village has a shop, a post office, and a pub/restaurant, along with a garage and a community centre. There are two recreation grounds and good sports facilities. Shopping facilities are available in Leighton Buzzard (about 3 miles) and Central Milton Keynes (about 9 miles). The property is situated within the Aylesbury grammar schools catchment area and there is a private nursery in the village. Free Buses and pick up to local schools. There are GP surgeries and dental practitioners in Leighton Buzzard.

+ Read more

Contact us

Michael Graham Milton Keynes
01908 399199
salesmk@michaelgraham.co.uk


Speak to us

If you would like to get in touch with us or have any questions regarding this property, please click the button below.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…