View gallery Floorplan Local area EPC
Love

52 Bedford Street

Ampthill, Bedfordshire, MK45 2NB

Asking Price
£285,000
2
1
1

Property Highlights

  • Grade II listed cottage
  • Ex Duke of Bedford
  • Two bedrooms
  • Family bathroom
  • Sitting room with open fireplace
  • Fitted kitche/breakfast room
  • Private rear garden with outbuilding
  • Town centre location

Property description

A Grade II listed brick under tile early 19th-century ex Duke of Bedford detached cottage with a rear garden in the centre of Ampthill.

This period character cottage has 636 sq. ft. of accommodation arranged over two floors. A solid wooden front door, protected by a tiled, Victorian storm porch, opens into an entrance space between the sitting room and the fitted kitchen/dining room, both of which have leaded light windows overlooking the front aspect. A staircase, which has an understairs cupboard, is accessed via a door in the kitchen and reaches the first-floor landing, with a further leaded window. The landing leads to two bedrooms, the principal bedroom is over 11 ft. square, and a three piece family bathroom. At the rear there is an enclosed, private garden, laid to lawn with a gravel area, and a 14 ft. by over 10 ft. outbuilding with windows flanking a central door, which could be used as a workshop or gym.

Ground Floor

The sitting room has two leaded light windows, one overlooking the front aspect, the other the rear garden, and an open fire with a decorative wood surround and an original 19th-century cast iron fireplace. The kitchen/dining room is fitted with a range of wall, base and draw units, worktops, a stainless steel sink with tiled splashbacks, and an extractor. There is laminate flooring, a door to the staircase and an external door to the side.

Situation and Schooling

Ampthill is an historic market town with a variety of restaurants, a Waitrose supermarket, a selection of small independent specialist shops, a music school, and a bookshop. The town is in the catchment area for the outstanding Redborne Upper School, and the Harpur Trust schools in Bedford are 8 miles away. There are several golf clubs in the area and Milton Keynes, with its theatre and shopping centre, is approximately 15 miles away.

+ Read more

Contact us

Michael Graham Woburn Sands
01908 586400
salesws@michaelgraham.co.uk


Speak to us

If you would like to get in touch with us or have any questions regarding this property, please click the button below.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…