View gallery Floorplan Local area EPC Brochure
Love

6 Newbury Lane

Silsoe, Bedfordshire, MK45 4ET

Guide Price
£625,000
4
2
2

Property Highlights

  • Modern detached property
  • Four bedrooms; one en suite, bathroom
  • Two reception rooms
  • Fitted kitchen/breakfast room
  • Cloakroom
  • Gas to radiator heating and double glazing
  • Established gardens
  • Driveway parking and double garage

Property description

A modern Neo Georgian style four bedroom detached property, with front and rear gardens, driveway parking, and a detached double garage, on the edge of the village.

The property was originally constructed in 2000 and provides 1,325 sq. ft. of accommodation. It is entered at the side into an L shaped hallway which has exposed oak flooring and a full turn staircase to the first floor. The sitting room has a bay window overlooking the front, and a centrally positioned feature Limestone fireplace with a Living Flame gas fire and custom built shelving either side. The dining room has exposed oak flooring and glazed sliding doors to the rear garden. There is also a fitted kitchen/breakfast room, and a cloakroom. The first floor landing has access to the loft space and to the four bedrooms, all of which have built-in wardrobes. The principal bedroom has an en suite shower room and there is also a family bathroom. Remotely operated twin iron gates open to a gravel driveway providing parking for up to four cars and access to the detached double garage which has up and over door, power connected, eaves storage and a side door.

Kitchen/Breakfast Room

The kitchen/breakfast room is fitted in a custom built range of cream fronted Shaker style units with granite work surfaces incorporating an inset sink and drainer. There is also a breakfast bar with additional storage and seating for up to four. Integrated appliances include an electric double oven, an induction hob with an extractor over, a fridge/freezer and a dishwasher. A door leads to the rear garden.

Gardens

The front is enclosed by a low wall with railings above and hedgerow and has a shaped lawn with established borders. The rear garden leads directly off the driveway and is enclosed by close boarded fencing for screening and privacy. It has a shaped paved patio for outdoor entertaining, with the remainder of the garden laid to lawn with borders housing a variety of trees, shrubs, and flowers. At the bottom of the garden there is a gravelled seating area which incorporates an ornamental fish pond.

Situation and Schooling

Silsoe is located just off the A6, almost equidistant from Bedford and Luton. It has a variety of local amenities that include shops, a lower school and country pubs. It also has over 130 listed buildings and is edged by the historic gardens of Wrest Park. There is a newly built community and sports facility. The catchment schools are Arnold Academy and Harlington Upper School. Silsoe is also on the school bus route to the Harpur Trust schools in Bedford, which is 10 miles away.

+ Read more

Contact us

Michael Graham Bedford
01234 220000
salesbe@michaelgraham.co.uk


Speak to us

If you would like to get in touch with us or have any questions regarding this property, please click the button below.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…