View gallery Floorplan Local area EPC Brochure
Love

Quarry Cottage

Sandy Lane, Aspley Heath, Bedfordshire, MK17 8TT

Guide Price
£1,200,000
5
2
3

Property Highlights

  • Victorian detached cottage
  • Five bedrooms
  • En suite shower room and family bathroom
  • Three reception rooms and a conservatory
  • Fitted kitchen/breakfast room; utility room
  • Mature wraparound garden
  • Parking for numerous cars
  • Woodland setting

Property description

A Victorian extended five bedroom detached cottage situated at the top of Aspley Heath woods adjacent to Duke of Bedford woodland

The property has a wealth of local history and forms part of the original village of Hogsty End. There is 2,530 sq. ft, of accommodation over two floors. The ground floor has an entrance porch and hallway, a sitting room, a family room, a dining room, a conservatory, a kitchen/breakfast room, a utility room, and a cloakroom. The landing has access to three of the bedrooms, the family bathroom and an area which could be used as a study which leads to the remaining two bedrooms. The dual aspect principal bedroom has an en suite shower room, built-in wardrobes and dressing table, and double doors to a raised deck area with woodland views. The four further bedrooms use the family bathroom which has a five piece suite with bath, separate shower, WC and twin washbasins. Set on a mature plot on Sandy Lane, the cottage has parking for numerous cars.

Ground Floor

The bespoke kitchen/breakfast room has a comprehensive range of full height, wall, and base units, including glazed display shelves and wine storage, with granite work surfaces, and an island with a breakfast bar. The dining room has the original fireplace with a log burner and an exposed brick wall. There is a sitting room with an open fireplace, and the conservatory overlooks the front garden.

Garden

The established garden wraps around the property. The front garden has a paved terrace by the conservatory with an ornamental pond, and a lawned garden with mature shrub borders. The rear garden is terraced into several levels with stone retaining walls and steps. It is mainly laid to lawn with mature shrubs, and various seating areas and is bordered by the trees of the surrounding woodland.

Situation and Schooling

Aspley Heath is a residential area on the edge of the Woburn Estate, with direct access to the Heath, with countryside walks and other outdoor activities. Woburn Golf and Country Club is around 3 miles away. There are shopping and leisure facilities in nearby Woburn Sands along with Swallowfield Primary School and Fulbrook Extended Secondary School. A daily bus runs to the Bedford Harpur Trust and Akeley Wood schools and to Thornton College.

+ Read more

Contact us

Michael Graham Woburn Sands
01908 586400
salesws@michaelgraham.co.uk


Request a viewing

Interested in viewing this property? You can easily request your viewing online or give us a call on 01908 586400.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…