View gallery Floorplan Local area EPC
Love

The White House

The White House, Watling Street, Little Brickhill, Buckinghamshire, MK17 9LR

Asking Price
£750,000
5
5
2

Property Highlights

  • Detached house currently run as a B and B
  • Four guest bedrooms with en suite shower rooms
  • Separate private suite with bedroom, bathroom and sitting room
  • Guest breakfast room
  • Kitchen/breakfast room and utility room with WC
  • Driveway parking
  • Mature south facing rear garden
  • Village location

Property description

A modern double fronted five bedroom detached house, with driveway parking, and a mature plot with a south facing rear garden in a village location.

The property has 2,219 sq. ft. of accommodation, and is currently run as a bed and breakfast, with four en suite guest bedrooms and a guest breakfast room. A separate entrance leads to a suite of rooms used by the owners as their living accommodation and comprises a sitting room, a bedroom, and a bathroom. There is also an entrance hall, a fitted kitchen/breakfast room with pantry, and a utility room with WC on the ground floor. The accommodation could be converted back into a private house if desired. At the front of the property a gravelled drive leads to a five bar gate and a gravelled path leads to the front door. The front garden is planted with trees and shrubs. Agents Note; The owners’ living accommodation has a Council Tax band of A and the bed and breakfast accommodation is council tax exempt.

Accommodation Highlights

The guest bedrooms all have en suite shower rooms. The guest breakfast room has a decorative fireplace with a tiled surround (non-working) and French doors to the rear garden. The dual aspect kitchen/breakfast room has a range of wall and base units with black worktops, a white ceramic sink, a walk-in pantry, and space for a breakfast table and chairs

Rear Garden

The mature private rear garden is planted with a variety of trees and shrubs. There is a lawn, various patio seating areas, flower and shrub beds and borders, a greenhouse, and an outbuilding. Access to the front of the property is via a five bar gate at the side of the house.

Situation and Schooling

Little Brickhill has a public house, a church, and a farm shop. Woburn (2 miles) has shops, restaurants, and public houses. The house is in catchment for High Ash Church of England Primary School (rated Outstanding by Ofsted) in Great Brickhill which feeds to Aylesbury Grammar School or The Cottesloe School (rated Good). Bow Brickhill (3 miles) has a primary school.

+ Read more

Contact us

Michael Graham Woburn Sands
01908 586400
salesws@michaelgraham.co.uk


Speak to us

If you would like to get in touch with us or have any questions regarding this property, please click the button below.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…