View gallery Floorplan Local area EPC
Love

16 Conger Lane

16, Conger Lane, Toddington, Bedfordshire, LU5 6BT

Asking Price
£995,000
6
3
3

Property Highlights

  • Modern detached house
  • Six bedrooms
  • Three shower or bathrooms
  • Three reception rooms
  • Kitchen/breakfast/family room
  • Mature landscaped rear garden
  • Double garage and driveway parking
  • Village location. No onward chain

Property description

A refurbished modern six bedroom detached house with a double garage, off street parking and a landscaped garden.

This extended and refurbished property has 3,055 sq. ft. of accommodation arranged over two floors and is sold with no onward chain. On the ground floor there is an entrance hall, a cloakroom, a sitting room with a feature minster fireplace and tri-fold doors to the rear garden and a dining room. An open plan kitchen/breakfast/family room has a pantry, bi-fold doors to the garden, and accesses a utility room. On the first floor, the principal bedroom has an en suite bathroom and a range of fitted wardrobes. There are five further bedrooms, two bath/shower rooms, and a games/play room. At the front of the property, a shingled driveway provides parking for several cars and has raised brick planters, the boundary enclosed by low-level walling. An integral double garage is accessed by an up and over door.

Kitchen/Breakfast/Family Room

The kitchen/breakfast area is fitted with an extensive range of two-tone, high gloss base and wall units with contrasting solid work surfaces. Integrated appliances include a five ring Bosch hob, a stainless steel extractor hood, a double oven, a fridge/freezer, a dishwasher, and a wine chiller. A central island unit provides additional workspace and a breakfast bar. The dining/family area has windows to the side and bi-fold doors to the rear garden.

Rear Garden

A patio, adjacent to the house extends to one side. The lawned garden is enclosed by borders with mature planting and established trees. A 'cut out' in conifers, opens to a u2018secret gardenu2019 with a cobbled path leading to a raised semi-circular seating area, and steps to a bridge over a waterfall feature. There is a further covered patio and two decked areas providing additional seating. There is a workshop with front and rear access.

Situation and Schooling

Situated on the edge of the Chiltern countryside, Toddington is a village with a traditional high street with shops, restaurants, public houses and GP and dental surgeries. The village is served by two schools, Toddington St George Church of England School, and Parkfields Middle School. Both schools are rated outstanding by Ofsted

+ Read more

Contact us

Michael Graham Woburn Sands
01908 586400
salesws@michaelgraham.co.uk


Speak to us

If you would like to get in touch with us or have any questions regarding this property, please click the button below.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…