View gallery Floorplan Local area EPC
Love

2 Monellan Grove

2, Monellan Grove, Caldecotte, Buckinghamshire, MK7 8NE

Asking Price
£775,000
4
2
4

Property Highlights

  • Detached property
  • Four bedrooms
  • Two bath/shower rooms
  • Four reception rooms
  • Modern kitchen/breakfast room
  • Utility and cloak rooms
  • Enclosed garden
  • Double garage, Parking for four cars, EV charger

Property description

An extended and re-furbished four bedroom property with a double garage and enclosed rear garden situated close to Caldecotte Lake

Located less than 0.25 mile from the lake, the property has been extended and re-furbished by the current owners to include a family room, with dining area, a sitting room with modern feature fireplace, a study and a modern kitchen/breakfast room with a walk through into a dining area and sitting room. There is also a utility and a cloakroom. There is underfloor heating in the kitchen and en suite On the first floor, there are four double bedrooms , all with built-in wardrobes. The principal bedroom has its own updated en suite shower room and there is a family bathroom which has also been updated. Outside and to the front, is a detached double garage with electric roller doors, eaves storage, power and light connected along with an EV charger. Parking for up to four cars and side access to the rear.

Kitchen/Breakfast Room

The kitchen/breakfast room, open plan with the family and dining rooms, has a comprehensive range of wall and floor units, including a breakfast bar, all with Quartz work surfaces and a tiled floor. Integrated appliances include, a gas hob, two electric ovens, two warming drawers, a microwave, a coffee machine, a dishwasher, and a wine cooler, along with wine storage and an atrium style ceiling, like that in the garden room. Automated blinds to the rear of the property

Garden

At the rear, the garden has a paved patio/entertaining area adjacent to the back of the property, accessed via sliding doors from the garden room and there is a further patio at the rear corner of the garden. The artificial lawn has planted gravel beds and borders, with timber fenced and walled boundaries.

Situation and Schooling

The property is situated 5 miles from Milton Keynes Coachway. Bow Brickhill railway station (0.25 miles) has services to Bedford. Shopping facilities are at the MK1 Shopping Park (1.5 miles), with further shopping in Central Milton Keynes (5 miles). The property is in the Walton High and Heronsgate Primary schools' catchment areas.

+ Read more

Contact us

Michael Graham Milton Keynes
01908 399199
salesmk@michaelgraham.co.uk


Speak to us

If you would like to get in touch with us or have any questions regarding this property, please click the button below.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…