View gallery Floorplan Local area EPC
Love

2 Ravel Close

2, Ravel Close, Old Farm Park, Buckinghamshire, MK7 8EY

Asking Price
£775,000
5
3
3

Property Highlights

  • Detached house
  • Five bedrooms
  • Three refitted bath or shower rooms
  • Three reception rooms
  • Refitted kitchen/dining room
  • Well maintained enclosed garden
  • Double garage, parking for two cars
  • Walton High school catchment

Property description

A detached five bedroom house with three bath or shower rooms, a well maintained garden and double garage located in the Old Farm Park area of Milton Keynes

This immaculately presented home has accommodation of approx. 2,000 sq. ft. set over two floors. The kitchen/dining room has been refitted along with all bath and shower rooms by the vendors to a particularly high standard so that the property is light and airy. On the ground floor there are three reception rooms, a kitchen/dining room with access to the garden. A utility and cloakroom. On the first floor there are five bedrooms, one is currently in use as a study, the master and bedroom two are en suite and there is a family bathroom. Outside and to the front, the property has hedged bordered and a path to the front door with the double garage situated to the side. To the rear, the immaculately maintained garden is enclosed and there are two patio seating areas.

Kitchen/Dining and Utility Room

The kitchen/dining room has matching base and eye level units. Integrated appliances include a Neff induction hob with a canopy extractor over, a Neff electric double oven with combi microwave and warming drawer, full length fridge and freezer, Quooker tap, dishwasher and wine cooler. The Amtico covered floor continues into the utility room which has matching base and eye level units with space and plumbing for a washing machine and a tumble dryer and a door to the side.

Outside

To the front, the garden is bordered by hedges and the property accessed via a gate and path to the front door. To the side, the double garage has twin up and over doors and power and light connected. The driveway provides parking for two cars. To the rear, the well maintained garden is enclosed by fencing and includes a lawned area, two patio seating areas, mature shrubs and trees. There is a door to the garage and a gated side access

Situation

Nearby leisure facilities include Caldecotte Lake (1 mile) and Woburn Golf Centre (5 miles). For shopping the Kingston Centre is 2 miles and Central Milton Keynes is 6 miles. Milton Keynes Central railway station (Euston, 36 minutes) is 6 miles away and M1 junction 13 is 4 miles. The property is within the Walton High School catchment area. There are further shopping facilities and GP, dental and veterinary surgeries in Walnut Tree (1 mile).

+ Read more

Contact us

Michael Graham Milton Keynes
01908 399199
salesmk@michaelgraham.co.uk


Speak to us

If you would like to get in touch with us or have any questions regarding this property, please click the button below.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…