View gallery Floorplan Local area EPC
Love

Finisterre

Mentone Avenue, Aspley Guise, Bedfordshire, MK17 8EQ

Guide Price
£1,250,000
5
2
3

Property Highlights

  • Victorian semi detached house
  • Five bedrooms
  • Two refitted bathrooms
  • Two reception rooms
  • Refitted kitchen/breakfast/family room
  • Conservatory
  • Mature wraparound gardens
  • Driveway parking with electric charger

Property description

A Victorian five bedroom semi detached house situated on a private road with off street parking and a garden in the centre of Aspley Guise village.

This refurbished property retains character features throughout such as high ceilings and original fireplaces, combined with modern refitted bathrooms and a comprehensive security system. Arranged over three floors the property has 2,875 sq. ft. of accommodation, including an entrance porch with original tiling, a hall, a sitting room, a dining room, a conservatory, a kitchen/breakfast/family room, and a cloakroom. On the first floor the dual aspect principal bedroom has a range of fitted wardrobes and the original fireplace. Bedroom two also has wardrobes and an original fireplace. There is a further bedroom and a three piece family shower room. On the second floor there are two additional bedrooms and a second bathroom refitted with a free-standing bath, a wash basin and a W.C.

Reception Rooms and Conservatory

The sitting room has a marble fire surround with a slate hearth and a wood burning stove, display shelving and a bay window overlooking the rear garden. The dining room has a bay window at the front of the house, a wooden fire surround with a slate hearth and a wood burning stove. The conservatory, accessed from the dining room, has a tiled floor and French doors opening to the garden.

Kitchen/Breakfast/Family Room

The kitchen/breakfast area is fitted with a range of wall, base and drawer units, worktops and a sunken sink with a mixer tap. Neff appliances include two ovens, a microwave with a warming draw, a dishwasher, and a washing machine. There is a free standing American style fridge/freezer and bi fold doors open to the rear deck.

Outside

The property is on a private road with a low maintenance garden at the front. There is a parking for two cars and an electric charger at the rear of the house. The mature rear garden is mainly laid to lawn with tree and shrub borders. A new decked area wraps around the rear and side of the house with further stone and paved seating areas.

Situation and Schooling

Aspley Guise is a Bedfordshire village with a hotel, a restaurant, and a gastropub. It is 1.5 miles from Woburn Sands, with its range of shops, restaurants, and facilities. The village has a lower school (Ofsted rated Outstanding), and there are further primary and extended secondary schools in Woburn Sands. A daily shuttle bus runs to the Harpur Trust Schools in Bedford.

+ Read more

Contact us

Michael Graham Woburn Sands
01908 586400
salesws@michaelgraham.co.uk


Speak to us

If you would like to get in touch with us or have any questions regarding this property, please click the button below.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…