View gallery Floorplan Local area EPC Brochure
Love

72 Mount Pleasant

Aspley Guise, Bedfordshire, MK17 8JU

Offers Over
£730,000
4
3
2

Property Highlights

  • Contemporary split-level detached home
  • Four bedrooms
  • Principal bedroom with roof terrace
  • Three bath/shower rooms
  • Two reception rooms
  • Sitting room /snug open plan with kitchen/dining room
  • Snug has terrace access
  • Far reaching countryside views

Property description

A contemporary split-level four bedroom detached home with parking in a village location with an enclosed rear garden and far reaching views across open countryside.

This property has been refurbished and extended over a period and now has approximately 2.058 sq. ft. of accommodation arranged over three floors. On the ground floor is an entrance hall with stairs to the first floor, a cloakroom, a kitchen/dining room, a sitting room, and a snug which opens out to a terrace overlooking open countryside. Accessed from stairs in the snug, the versatile lower ground floor is currently used as a family room. It has an en suite shower room and a private entrance, making it ideal as a guest suite, a fourth bedroom, a home office, or a self-contained annexe for teenagers or visitors. The principal bedroom has an en suite shower room and bi-fold doors leading to a private roof terrace with a glazed balustrade overlooking the garden and far reaching countryside views. There are two further bedrooms, and a family bathroom featuring a freestanding roll-top bath.

Ground Floors

The nearly 20 ft. by 13 ft. ground floor sitting room has an open fireplace with a log burner set in a feature wall and leads to the snug which has sliding doors opening to the first roof terrace with decking and a balustrade. Steps lead up from the sitting room to the kitchen/dining room which is fitted with a range of wood fronted wall and base units, marble worktops, and a ceramic sink with a hot water tap. There is an eye level double oven, a gas hob, and an extractor. Stairs from the snug lead down to the over 23 ft. by over 17 ft. family room which has three sky lights and further sliding doors to the rear garden.

Outside

To the front of the property is a block paved driveway with parking. The established rear garden is landscaped with raised flower beds, mature trees, a lawn area, shingle areas, and a patio seating area. The garden, mainly enclosed by timber fencing, backs onto open fields and has far reaching views over uninterrupted open countryside.

Situation and Schooling

Aspley Guise is 1.5 miles from the town of Woburn Sands which has a selection of shops and restaurants. Aspley Guise has Moore Place Hotel, The Anchor public house and The Blue Orchid Thai Restaurant. There is a lower school in Aspley Guise, and a primary and an extended secondary school in Woburn Sands. A daily shuttle bus runs to the Harpur Trust Schools in Bedford.

+ Read more

Contact us

Michael Graham Woburn Sands
01908 586400
salesws@michaelgraham.co.uk


Request a viewing

Interested in viewing this property? You can easily request your viewing online or give us a call on 01908 586400.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…