View gallery Floorplan Local area EPC Brochure
Love

The Oaks

57A Newport Road, Woburn Sands, Buckinghamshire, MK17 8UQ

Offers Over
£850,000
5
3
3

Property Highlights

  • Individually designed detached house
  • Five bedrooms
  • Three bath or shower rooms
  • Two reception rooms
  • Over 23 ft. kitchen/dining room and utility room
  • Bespoke features and design throughout
  • Private gated driveway and integral garage
  • Village location

Property description

A modern individually designed five bedroom detached house with an enclosed low maintenance rear garden, a private gated driveway with parking for several cars, and an integral garage.

Built in 2010 to exacting standards and set on a private plot this property has 1,935 sq. ft. of accommodation with character features throughout including exposed reclaimed oak ceiling beams, feature brickwork walls, and handcrafted wooden floors and internal doors. On the ground floor there is an entrance hall, a sitting room, a family room, a kitchen/dining room, a utility room, and a cloakroom. Leading off the landing, the principal bedroom has two double wardrobes and an en-suite shower room. There are four further bedrooms, a second en suite shower room and a family bathroom. Remotely operated electric gates open to a driveway with parking for a number cars. The grounds are fully enclosed with brick walls and timber fencing. Two gated entrances access the rear garden.

Ground Floor

The over 23 ft. open-plan kitchen/dining room is at the rear of the property with French doors opening directly to the garden. The bespoke fitted kitchen has granite work surfaces, handcrafted natural timber cabinetry, and a raised glass ceiling. Double doors lead from the kitchen into the sitting room, which has a brick fireplace with a cast iron log burner. This room also has a set of French doors to the rear garden giving a good flow through the internal and external space for modern family life and entertaining.

Rear Garden

The rear garden is enclosed by timber fencing and tall hedging for privacy and security and has been landscaped for ease of-maintenance. It has an artificial lawn and a play area with a child’s climbing frame which is to remain. There is a raised patio seating area spanning the rear of the house, and a further patio at the far end of the garden providing ample space for outdoor dining and socializing. The bottom patio houses a summer house which will also remain.

Situation and Schooling

The Buckinghamshire village of Woburn Sands has a high street with GP and dental surgeries, shops, restaurants, and public houses. A monthly farmers' market is held on the village green. There are two schools in Woburn Sands - Swallowfield Primary and Fulbrook Extended Secondary - and a daily bus service to Bedford, Thornton, and Akeley Wood schools.

+ Read more

Contact us

Michael Graham Woburn Sands
01908 586400
salesws@michaelgraham.co.uk


Speak to us

If you would like to get in touch with us or have any questions regarding this property, please click the button below.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…