View gallery Floorplan Local area EPC Brochure
Love

9 Arpins Pightle

Cranfield, Bedfordshire, MK43 0GG

Asking Price
£385,000
3
2
2

Property Highlights

  • Contemporary semi detached house
  • Three bedrooms; one en suite shower room
  • Dual aspect sitting room in excess of 18 ft.
  • Triple aspect kitchen/dining room
  • Downstairs cloakroom
  • Main bathroom
  • Garage and off street parking
  • Enclosed rear garden

Property description

A contemporary three bedroom semi detached property with an en suite shower room, a garage and off street parking, situated in cul-de-sac location in the village of Cranfield.

The accommodation includes an entrance hall with stairs to the first floor with an understairs storage cupboard, and modern cloakroom. Also on the ground floor is a dual aspect sitting room with a bay window to the front and double doors to the rear garden, and a triple aspect kitchen/dining room. On the first floor the principal bedroom has an en suite shower room which has a fully tiled double shower cubicle, a vanity wash basin, and a WC. There are two further bedrooms, and a main bathroom. The property is double glazed and has gas to radiator central heating.

Kitchen/Dining Room

The kitchen area has a range of high gloss wall and base units with work surfaces incorporating a stainless steel one and a half bowl sink and drainer. Built-in appliances include an oven and hob with an extractor fan above, and a dishwasher, and there are spaces for a washing machine and fridge/freezer. Tiled flooring continues into the dining area which has double doors to the rear garden, and a door to the entrance hall.

Outside

The low maintenance front garden has a picket fence boundary, and a blocked paved driveway to the side has an EV charging point and leads to the single garage with power and lighting. Gated side access leads to the enclosed rear garden which has a paved patio seating area spanning the rear of the house, and a path to a pedestrian door to the garage. The rest of the garden is laid to lawn and has a raised wooden bed.

Situation and Schooling

Cranfield village has two public houses, a football club, a hairdresser, several take away restaurants, and two small supermarkets, one incorporating a post office. There is also a doctors’ surgery, a dental practice and pharmacy, two parks and a multi-use games area. Schooling is available at Cranfield Church of England academy, Holywell middle school, Wootton upper school and Bedford Harpur Trust schools.

+ Read more

Contact us

Michael Graham Newport Pagnell
01908 218860
salesnp@michaelgraham.co.uk


Request a viewing

Interested in viewing this property? You can easily request your viewing online or give us a call on 01908 218860.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…