View gallery Floorplan Local area Brochure
Love

Spinney Cottage

Spinney Lane, Aspley Guise, Bedfordshire, MK17 8JT

Guide Price
£425,000
2
1
2

Property Highlights

  • Grade II listed detached cottage
  • Two double bedrooms
  • Refitted shower room
  • Two reception rooms
  • Bespoke kitchen
  • Enclosed cottage garden
  • Driveway parking for four vehicles
  • Village location

Property description

A Grade II listed 18th-century two bedroom thatched cottage with off street parking and an enclosed garden situated on a quiet lane in the village of Aspley Guise.

Built in the 1700s, this detached cottage has over 890 sq. ft. of accommodation set over two floors and retains many original features including: latched doors, multi-pane glazed windows, exposed original beams, and an enclosed and established cottage garden. An entrance porch with windows opens into the sitting room which has a multi-fuel burner. A latched door from the sitting room accesses the dining room. There is a bespoke country style kitchen with a quarry tiled floor, fitted with a range of base and wall units and appliances. This has a door to the garden and an internal door to an inner lobby which opens to the refurbished shower room. An adjacent utility room has base units with an inset sink and a door to a further dual aspect, glazed roofed utility area. The first floor landing leads to two dual aspect double bedrooms. The rear cottage garden has block paved and shingled areas, mature planting, a pergola, and a BBQ area. There is driveway parking for four cars.

Reception Rooms

The over 14 ft. by over 11 ft. sitting room has a dual aspect, windows with wooden shutters, a multi-fuel burner set on a tiled hearth, and built-in storage on either side of the chimney breast. There is also an open tread wooden staircase leading to the first floor. A latched door opens into the over 11 ft. by over 10 ft. dining room, which has a dual aspect and a feature brick-built open fireplace. Both rooms have exposed ceiling timbers featuring early chamfered spine beams.

Situation and Schooling

Aspley Guise is 1.5 miles from the town of Woburn Sands which has a selection of shops and restaurants. Aspley Guise has The Anchor public house and The Blue Orchid Thai Restaurant. There is a lower school in Aspley Guise - with an Ofsted rating of Outstanding - and a primary and an extended secondary school in Woburn Sands, both with a Good Ofsted rating. A daily shuttle bus runs to the Harpur Trust Schools in Bedford.

+ Read more

Contact us

Michael Graham Woburn Sands
01908 586400
salesws@michaelgraham.co.uk


Speak to us

If you would like to get in touch with us or have any questions regarding this property, please click the button below.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…