View gallery Floorplan Local area EPC Brochure
Love

98 Russell Road

Toddington, Bedfordshire, LU5 6QF

Asking Price
£950,000
4
3
3

Property Highlights

  • Modern detached fully furnished show home
  • Four bedrooms
  • Three bath/shower rooms
  • Three reception rooms
  • Kitchen/breakfast/family room
  • Parking, triple garage and EV charger
  • Professionally landscaped front and rear gardens
  • Air source heat pump, solar panels and battery

Property description

A brand new, high specification four bedroom, three bathroom, fully furnished show home by Hayfield Homes with an A rated EPC and a south easterly facing rear garden, for sale with no upper chain.

The property has been professionally interior designed, and finished to a high standard including fabric wall coverings and hand painted panelling. It is for sale as seen with all the carpets and curtains, three wall-mounted TVs, artwork, a marble dining suite and all the kitchen appliances and contents. There are four fully furnished bedrooms, and three luxury bath or shower rooms. Underfloor heating on the ground floor is powered by an air source heat pump, and there are also solar panels and battery storage. There is a speaker system in the ceilings downstairs and in the principal bedroom. The property has has an electric car charger, driveway parking for up to six cars, and a triple garage which is currently used as a sales office. This will be converted back to a garage and the driveway tarmacked by the end of March 2026. There is approved planning permission to convert the garage into a usable room if desired and the property comes with a ten-year NHBC build guarantee.

Ground Floor

At the front of the property there is a formal dining room and a study which both have bay windows. The study has increased soundproofing to facilitate concentration at work. The sitting room overlooks the rear garden and has French doors to a patio. The impressive open-plan kitchen/dining/family room is also at the rear with bi-fold doors to the garden. The kitchen is fitted with a comprehensive range of full height, wall, and base units, with complementary work surfaces, and a central island. All the integrated appliances are by Siemens and include a double oven, an induction hob and extractor, a fridge/freezer, and a dishwasher.

Rear Garden

The property is on the edge of the development and the professionally landscaped walled rear garden is private and not overlooked. It is south easterly facing and is laid mainly to lawn with mature planting providing colour. The paved patio at the rear can be accessed from the kitchen/dining/family room and the sitting room giving an excellent flow from the internal to external space for modern family life and entertaining. All the patio and garden furniture shown in the photos, including two luxury sun loungers and an outdoor dining table and chairs, is also included.

Location and Schooling

Situated on the edge of the Chiltern countryside, Toddington is a village with a traditional high street with shops, restaurants, public houses and GP and dental surgeries. The village is served by two schools, Toddington St George Church of England School, and Parkfields Middle School. Both schools are rated outstanding by Ofsted. The Harpur Trust schools are in Bedford (approximately 19 miles away).

+ Read more

Contact us

Michael Graham Woburn Sands
01908 586400
salesws@michaelgraham.co.uk


Request a viewing

Interested in viewing this property? You can easily request your viewing online or give us a call on 01908 586400.

Try our finance tool

Mortgage calculator

We provide expert financial advice tailored to your unique needs. With integrity, honesty, and exceptional customer care as our guiding values, you can trust our experienced advisors to help you make sound financial decisions, whether it’s for mortgages, insurance, or protection policies.

Some of our other services…